Here's where we left off last blog:
Once we got the trusses up it was time for the roofing:
With much debate we chose black shingles:
Got a new whip and customized the seats:
Installed the board siding:
Installed some windows:
Started installing the entrance:
And the inside is slowly coming together, one day at a time!
We are getting closer and closer to our end product, launch of our social media, and the start of booking. We were lucky enough to work with our sole contractor, Richard Pednault, of Rough Sawn Construction, out of Standish. If you are looking or know someone looking for construction of a rough sawn lumbar building... his work is amazing. He can be reached at (207)776-3425.